Sunday, March 21, 2010

Day 22 (Brake Lines and other Stuff Removal)

I was able to tackle part of the brake lines today. I had to clean the brake line and the wrench then hammer the wrench on to line then broke loose the nut and had to pry the wrench off. I also removed the equalizer bar and a few patch panels.
Still left to do:
- Finish removing the brake lines
- Remove shocks
- Remove fuel line
- Remove any loose clips








Day 21 (Trim Removal cont.)

Travis once again came over and removed parts with the speed of a mongoose. He was removing parts faster than I could tag and bag them. He removed the front and rear windshield molding clips which we were all rusted. In addition, he was able to remove the exterior window trim on both sides, as well as drill out a few screws that were so rusted, that when a screwdriver was applied, the screw started to disintegrate. We also removed the trunk hinges. We did get stuck on the brake lines. I hope to tackle this tomorrow. I cleaned up the garage a bit and took a load of stuff to the dump including the exhaust pipes we removed the week before.







Day 20 (Trim Removal)

Travis came over today and we started removing many little parts for the sandblasting. Travis and I were able to remove the rear windshield, and cut out the exhaust pipes.