This weekend we busted out the welder and started putting the floor back in. We were using “0.23” welding wire which was pretty forgiving on the sheet metal but proved to be a bit more difficult welding the sheet metal to the frame. I also found I should have used many more plug welds to secure the floor to the floor supports. We will probably have to drill a few more just to secure the floor a little bit more. Travis cut out the driver side after we had the passenger side welded in. We just need to reset the Driver side panel tape line and then perform a few final cuts and it should be ready to weld.
Tuesday, June 01, 2010
Subscribe to:
Posts (Atom)