Today, Travis and I got the Driver side floor in. This time around it was a little bit more difficult the new floor pan required some…” persuasion” to fit properly. After some negotiating with a hammer, we got the panel settled in and began to hammer and dolly the panel to fit. Travis began welding and we were off. We did hit a snag where the pan wasn’t making contact with floor brace. So we had to grind and re-drill the pan, hammer it down then re-weld.
Monday, June 21, 2010
Subscribe to:
Posts (Atom)